Supply, Installation And Commissioning Of Fitment Of 30 Litter Lhb Water Tank In Icf Design 1St And 2Nd Ac Coaches For 100 Icf Ac Coaches (400 Lavatories) As Per Rly, Rsp. The Material Shall Be Supplied As Per Rdso Instruction No. Mc/ Cb/Lf/Anaerobic Dated: - 23/07/2024. Confirming Annexure-1. [ Warran Ty Period: 84 Months After The Date Of Delivery ] ]