The Purpose Of The Contract Is To Carry Out A Detailed And Advanced Assessment Of The Gómez Bridge. The Aim Of The Work Is To Determine The Current State Of The Bridge, Assessing Its Ability To Withstand Service Loads, Proposing Appropriate Preventive Measures In Order To Extend The Useful Life Of The Structure According To Current Regulations, Which Will Be Developed In A Project Or Valued Report, Having To Consider Complex Technical Aspects That Require Specialized Knowledge In Structural Engineering And Bridge Repair.