Design, engineering, procurement, installation, and commissioning works for the following: 1. A 400 kV line to connect the National Water Carrier Main 400/132 kV substation with the existing Aqaba-Ma'an 400 kV line. 2. A 132 kV line to connect the National Water Carrier 132 kV substation with the second pumping station (BPS2). 3. A 132 kV line to connect the National Water Carrier 132 kV substation with the new Al-Quwayra Solar substation, passing through the third pumping station (BPS3). 4. A 132 kV line to connect the fourth pumping station (BPS4) with the existing Al-Bayader-Queen Alia line.