Reconstruction And Expansion Of The Existing Office And Workshop Building Into The Hall Of The Tram Service Station (Building A) And Reconstruction, Construction And Demolition Of The Track And Network System Along With The Construction Of Track Drainage And Technical Infrastructure In Two Stages.