Partial Dismantling And Modernization Of A 1,150 Kg Panoramic Elevator, Pmr, 4 Levels, Single Sided. Installation Of A 630 Kg, Pmr, 5-Level, Single-Sided Elevator. Installation Of A Pmr Platform. The Duration Of The Work Is 75 Working Days, To Begin In The First Half Of 2027.