1)Sbc-Tk-Spgr Section- Proposed Construction Of Rob At Lc.No50 @Km:85/700-800 42M Composite Girder 2)Proposed Construction Of Rub At Lc Gate No.48 @Km 81/500-600 Between Mallasandra And Gubbi Stations In Aden/Ypr Sub Division 3)Sbc-Tk-Spgr Section-Proposed Limited Height Subway At Old Lc43 (Rub N0.297 B At Km:73/000-100 Near Bheemasandra - Rcc Box Of Size 1X5X2.25 By Rolling/ Launching Method 4)Ypr-Spgr Section-Proposed Subway At Old Shettyhalli Gate Km 67/700-800 Neat Shettyhalli- (Bridge No.308-D) Rcc Box Of Size 1X4X2.25 By Rolling/Launching Method 5)Provision Of Lifts At Gbd Railway Station For Pf-1 & Pf-2&3 6)Provision Of Two Escalators (Down Direction) At Pf-1 & Pf-2&3 Of Kengeri Railway Station (Pid: 14.01.53.25.3.50.008) 7)Jtj-Sbcsection- Proposed Pedestrian Subways To Facilitate Crossing Of Railway Alignment By Cattle, Pedestrians And Smaller Vehicles In Various Locations As Rcc Box Of Size 1X5Mx2.65M (Barrel Length = 18.36 Mtrs) By Rolling/Launching Method 8)Sbc-Spgr Section- Proposed Pedestrian Subways To Facilitate Crossing Of Railway Alignment By Cattle, Pedestrians And Smaller Vehicles In Various Locations As Rcc Box Of Size 1X5Mx2.65M (Barrel Length = 18.36 Mtrs) By Rolling/Launching Method (Total 11 Nos) 9)Ypr-Ynk Section- Proposed Pedestrain Subway At Sahakara Nagara At Km 13/200-300 Near Nti Layout- Rcc Box Of Size 1X4X2.25 By Rolling/Launching Method In Aden/Ypr Sub-Division 10)Provision Of Dg Sets At Running Rooms And Crew Rest Rooms Over Sbc Division 11)Improvement Of Illumination In Tunnel (600M Length) Near Tasa At Km 42/750 - 43/350 12)Sbc-Spgr Section - Proposed Extension Of Fob At Ndv Station To Accommodate Raod-1A With Stair & Lift 13)Implementation Of Investment Grade Energy Audit (Igea) Recommendations At 30 Locations Over Sbc Division