Supply Of Laboratory Reagents/Consumables For The Analyzers Installed In The Hospital Of The Ship “Juan De La Cosa” From May 15, 2026 Or Subsequent Formalization Date, With A Duration Of 12 Months And The Possibility Of Two Possible Extensions Of 12 Months Each.