Relocation Of 125X115Mm Dia And 70 Mtr. Deep Drilled Tube Well With Installation Of Im-Ii Hand Pump. 1.85M Dia Pcc Platform And 3.0M Long Drain On Turnkey Basis In Different Rural Habitation Under D.W. And S. Division, Jamshedpur For The Fy- 2026-27