Resolution Of The Government Delegation In Castilla-La Mancha By Which The Lifting Of Minutes Prior To The Occupation Of Certain Farms Affected By The Construction Of The "Hybrid Gecama Plant Is Convened, With A Photovoltaic Generation Module Of 225 Mw Of Installed Power And A Storage Module By 100 Mw Of Power Batteries", Located In Atalaya De Cañavate Juncosa, In The Province Of Cuenca.